Construction Steps of Anti-Static Floor

April 27,2022

Anti-static floor is a device that connects to the ground and the workplace to form electrostatic induction. It is widely used in various professional computer rooms such as computer centers, communication centers, and data centers, or hospital operating rooms, anesthesia rooms, and other places sensitive to electrostatic induction.

 

Anti-static floor

 

So, do you know what the construction steps of anti-static floor are?

 

  1. Carefully check the flatness of the ground and the verticality of the walls. If you see a huge problem or need to be partially updated, you should give feedback in time;

 

  1. Pull the horizontal line, and use the ink line to bounce the floor installation height to the wall to ensure that the floor after paving is within the same level, accurately measure the length and width of the house and select the reference part, and pop up the network grid of the assembled support on the ground. Lines to ensure a neat and beautiful pavement, while minimizing floor cutting;

 

  1. Adjust the assembled support to the same required height and place the support to the intersection of the ground grid lines;

 

  1. Use assembly screws to fix the truss beam to the support, and use a level ruler and a square ruler to correct the truss beam one by one, so that they are both in the same plane and perpendicular to each other;

 

  1. Use a suction plate to place the raised floor on the assembled truss;

 

  1. If the remaining specifications near the wall are lower than the length of the raised floor, you can make up for it by cutting the floor;

 

  1. When paving the anti-static floor, level the ground piece by piece with a water bubble leveler. The height of the raised floor is adjusted by the adjustable support. During the paving process, it should be handled with care to prevent scratching the floor and damaging the edge strips. At the same time, it should be cleaned while paving to prevent debris and floating ash from staying under the floor;

 

  1. When setting up heavy machinery and equipment in the machine room, the support can be modified under the floor of the machine and equipment base to prevent the floor from being deformed;

 

  1. When the HPL decorative board needs to be cut or opened, a φ6-φ8 crack stop hole should be made at the concave corner of the opening to prevent the floor decoration surface from cracking after processing.

 

Last few words

 

For more questions, please feel free to contact us.

SHARE US: